Future land use
Orlando Future Land Use Map and Comprehensive Plan (Growth Management Plan)
Where the City of Orlando's future land use map and Growth Management Plan live, what the activity center, mixed use corridor, residential, office, and industrial categories allow, how they limit rezoning, and which plan amendments are moving in 2026.
The City of Orlando's comprehensive plan is the Growth Management Plan (GMP), which the city also calls Orlando's 2050 Growth Management Plan. Its Future Land Use Map sets the use, the maximum density, and the maximum intensity each parcel can reach, and every rezoning must be consistent with it. Zoning says what a parcel is today. The future land use map says what the city has planned it to become. For current zoning districts, see the Orlando zoning map guide.
Where the Orlando future land use map and comprehensive plan live
- Orlando Information Locator: the city's interactive property map. Search an address and choose "Planning and Development" to see the future land use designation.
- Future land use PDF sheets: 28 map sheets, plus a citywide overview and a legend, listed in the city's Map Library. Sheet dates vary (some date to 2019), and the sheets say they are for reference only.
- Future land use GIS layer: the "Orlando Future Land Use Designation" layer on the city's open data hub, with each parcel's category code. It refreshes nightly, so it is more current than the PDF sheets.
- Growth Management Plan document: six chapters of PDFs on the city's GMP page. Chapter 2 holds the Future Land Use Element, Figure LU-1 (standards for each category), and the subarea policies.
- Official map: Figure LU-2, "Future Land Use - 2050," is part of the Official Future Land Use Map Series. The official copy is kept by the City Planning Division on the 6th floor of City Hall, 400 S. Orange Ave.
- Questions: the City Planning Division, 407.246.2269 or cityplanning@orlando.gov.
Growth Management Plan at a glance
- Adopted: August 12, 1991.
- Latest rewrite: the GMP Refresh, adopted September 8, 2025 (Ordinance 2025-22), effective October 9, 2025. The city said the refresh would not change the future land use designation or zoning of individual properties.
- Last amended: January 12, 2026 (Ordinance 2025-42), effective February 12, 2026, per the Chapter 1 cover.
- Horizon: 2050, backed by the city's 2024 to 2050 Growth Projections Report.
- Structure: 15 elements in 6 chapters. Future Land Use, Housing, and Preservation and Design are in Chapter 2.
- Status: current. No new rewrite has been announced.
Future land use categories
Figure LU-1 sets the standards below. Maximums are before bonuses, and "and/or" is how the plan writes them. Subarea policies (numbered LU.S) often set different limits for specific areas, so read the subarea policy for any parcel before relying on the table. Codes are the ones used on the GIS layer.
| Category | Code | Max density | Max intensity | What it is for |
|---|---|---|---|---|
| Downtown Activity Center | DT-AC | 200 units/ac. | 4.0 FAR | Downtown. Residential, office, commercial, industrial, and public uses. Minimum 75 units/ac. and/or 0.75 FAR. |
| Metropolitan Activity Center | MET-AC | 200 units/ac. | 3.0 FAR | Regional centers. Minimum land area 100 acres. |
| Urban Activity Center | UR-AC | 100 units/ac. | 1.0 FAR (written "or") | Urban-scale mixed-use centers. Minimum land area 40 acres. |
| Community Activity Center | COMM-AC | 40 units/ac. | 0.7 FAR | Community shopping and mixed use. Minimum land area 8 acres. |
| Neighborhood Activity Center | NEIGH-AC | 30 units/ac. | 0.3 FAR | Small centers serving nearby neighborhoods. Minimum land area 3 acres (2 in the Traditional City). |
| Mixed Use Corridor, High Intensity | MUC-HIGH | 200 units/ac. | 1.0 FAR | Mixed use along corridors at high intensity. Minimum 30 units/ac. and/or 0.4 FAR. |
| Mixed Use Corridor, Medium Intensity | MUC-MED | 30 units/ac. | 0.5 FAR | Mixed use along corridors at medium intensity. |
| Mixed Use/Neighborhood Development | MU-ND | 12 units/ac. | 0.4 FAR | Mostly residential, with office and commercial capped at 5 percent of the site. |
| Residential Low Intensity | RES-LOW | 12 units/ac. (16 for duplex and townhome units) | 0.3 FAR | Single-family and duplex neighborhoods. ADUs do not count toward density. |
| Residential Medium Intensity | RES-MED | 30 units/ac. | 0.30 FAR | Townhomes and apartments. Minimum 12 units/ac. |
| Residential High Intensity | RES-HIGH | 200 units/ac. | 0.35 FAR | The highest-density residential category. Minimum 30 units/ac. |
| Office Low Intensity | OFFICE-LOW | 21 units/ac. | 0.40 FAR | Small offices mixed with homes. |
| Office Medium Intensity | OFFICE-MED | 40 units/ac. | 0.70 FAR | Offices and apartments. |
| Office High Intensity | OFFICE-HIGH | 200 units/ac. | 1.0 FAR | Large office and residential buildings. |
| Industrial | INDUST | 40 units/ac., only where a subarea policy and zoning allow | 0.7 FAR | Industry and office, with commercial as a secondary use. |
| Public, Recreational and Institutional | PUB-REC-INST | N/A | N/A | Schools, public buildings, parks, and institutions. |
| Conservation | CONSERV | 1 unit/5 ac. | 0.05 FAR | Natural land, with passive parks and trails only. |
| Urban Reserve | Not stated | 1 unit/10 ac. | 0.05 FAR | Rural land held for future urban growth. |
| Airport Support District, High Intensity | AIR-HIGH | Not stated | 1.5 FAR | Employment land near Orlando International Airport (Southeast Orlando Sector Plan). |
| Airport Support District, Medium Intensity | AIR-MED | 25 du/gross acre | 0.7 FAR | Employment and residential near the airport (Southeast Orlando Sector Plan). |
| Town Center/Urban Transit Center | Not stated | 50 du/gross acre | No maximum for non-residential uses | Southeast Orlando Sector Plan town center. |
| Village Center/Urban Transit Center | Not stated | 30 du/gross acre | No maximum for non-residential uses | Southeast Orlando Sector Plan village center at transit. |
| Village Center | Not stated | 30 du/gross acre | No maximum for non-residential uses | Southeast Orlando Sector Plan village center. |
| Neighborhood Center | Not stated | 25 du/gross acre | 0.3 FAR for non-residential uses | Southeast Orlando Sector Plan neighborhood center. |
| Residential Center | Not stated | 12 du/gross acre | Not stated | Southeast Orlando Sector Plan residential areas. |
| Urban Village | URB-VIL | Set by subarea policy | Set by subarea policy | Large planned areas with their own subarea standards. |
| Transit 1 and Transit 2 overlays | Not stated | Set by Subarea Policies LU.S.12.9 and LU.S.12.9.1 | Set by subarea policy | Transit-area standards. |
| Kaley Overlay | Not stated | Set by Policy LU.S.12.8 | Set by Policy LU.S.12.8 | Kaley Street area. The policy allows up to 100 units/ac. and/or 2.0 FAR as a bonus. |
The GIS layer also shows a Resource Protection overlay (written /RES-PRO) on many categories and an URB-RES value. The plan's table does not define URB-RES; ask planning staff what it means for a parcel.
For investors and developers, the categories that matter most are the activity centers (DT-AC, MET-AC, UR-AC), MUC-HIGH, RES-HIGH and OFFICE-HIGH (each up to 200 units/ac.), Industrial at 0.7 FAR, and the Airport Support Districts near Orlando International Airport. Some subarea policies go further. Policy LU.S.14.18A, for example, sets a maximum of 200 du/ac and/or 3.0 FAR.
How the future land use map limits zoning
Florida law requires land development regulations and development orders to be consistent with the adopted comprehensive plan (Fla. Stat. 163.3194). The city puts it plainly: all new development must be consistent with the goals, objectives, policies, and maps of the GMP, and a proposal that is not consistent may need a GMP amendment.
In practice, the future land use category is the ceiling and zoning works inside it. Figure LU-7, the Land Use Category Matrix, shows which zoning districts fit each category. A rezoning to a district that the parcel's category does not allow needs a GMP amendment first, or alongside it. Leaving the UR (Urban Reserve) zoning district takes a GMP amendment. A zoning verification letter states both the zoning district and the future land use designation, with any subarea policies. For zoning districts and the rezoning steps, see the Orlando zoning map guide.
What it can be used for today
Check a parcel's current zoning
The future land use map shows where a city is headed. Zoning decides what you can build now. Zoning AI reads the ordinance for a specific parcel and answers questions about permitted uses, setbacks, FAR, height, or parking, with the section it came from.
- Plain-English answers with section-level citations
- Filter parcels by zoning before you spend a day on due diligence
- Owner, lot size, and last sale next to the zone
Free trial
How to change a parcel's future land use
A future land use change is a GMP amendment adopted by ordinance. Florida separates small-scale and large-scale amendments; see the guide to Florida comprehensive plan amendments.
- Pre-application meeting with the City Planning Division. Staff confirm whether the change is small-scale or large-scale and give a schedule.
- Small-scale or large-scale: the city says most small-scale amendments are projects under 50 acres. All others are large-scale. Text changes must also go to the Florida Department of Commerce.
- Municipal Planning Board public hearing and recommendation.
- City Council: a small-scale amendment is adopted by ordinance. A large-scale amendment has two City Council hearings, with state review between them.
- Companion rezoning: a rezoning that depends on the new category is often filed at the same time and heard with it.
The city does not state a typical timeline or the amendment fee on its GMP page. Ask for both at the pre-application meeting. Land annexed into the city gets a city future land use designation only through a GMP amendment after annexation.
What is changing in Orlando
As of November 15, 2026:
- Ordinance 2026-16, Florida Hospital Health Village: changes the future land use designation of seven parcels, about 2.92 acres, east of I-4, north of East New Hampshire Street, and south of Westchester Avenue. City Council hearing July 13, 2026. Companion Ordinance 2026-17 adds the land to the Florida Hospital Health Village Planned Development. Confirm the outcome with the City Clerk. Notice.
- Ordinance 2026-20, Subarea Policy LU.S.2.5: increases the residential unit allowance in the subarea south of Oglesby Avenue, west of Clay Street, north of East Par Street, and east of I-4. City Council hearing July 13, 2026. The notice does not give the unit numbers. Notice.
- GMP2026-10008, Capital Improvement Element 2026 to 2031: updates Figure CI-5 and Policy CI.2.2.14 to match the city's capital program. Municipal Planning Board, September 15, 2026. Anticipated cases.
- Orange County's Vision 2050, set to take effect December 21, 2026, with state approval: unincorporated land next to the city follows the county plan, and so does land annexed into the city until the city adopts a GMP amendment for it. See the Orange County future land use guide. Report.
Other plans that apply
- Southeast Orlando Sector Plan: Goal LU.4 and Figure LU-5 set the categories and standards for Lake Nona and the airport area.
- Subarea policies: the LU.S policies in Chapter 2 change the limits for specific areas, such as the Kaley Overlay (LU.S.12.8) and the transit overlays (LU.S.12.9).
- Narcoossee Road/Lake Whippoorwill Study Area: an adopted map, Figure LU-15.
- Orange County: many "Orlando" addresses are in unincorporated Orange County, which has its own future land use map.
How to check a parcel's future land use
- Open the Orlando Information Locator, search the address, and choose "Planning and Development."
- Confirm the parcel is inside the city limits. If it is not, use the Orange County map instead.
- Note the future land use category and any overlay, such as /RES-PRO.
- Look up the category in Figure LU-1 of GMP Chapter 2, then check Figure LU-7 for the zoning districts that fit.
- Search Chapter 2 for any subarea policy that covers the parcel, and check the Municipal Planning Board's anticipated cases for pending amendments.
- Confirm the designation with the City Planning Division, or request a zoning verification letter, before you rely on it.
Frequently asked questions
Where is the Orlando future land use map?
The Orlando Information Locator shows each parcel's future land use under "Planning and Development." The city also posts 28 PDF map sheets in its Map Library and a GIS layer that refreshes nightly. The official copy is Figure LU-2 of the Growth Management Plan, kept by the City Planning Division.
What is Orlando's Growth Management Plan?
It is the city's comprehensive plan, also called Orlando's 2050 Growth Management Plan. It was first adopted in 1991 and refreshed in 2025, with a horizon of 2050. Its Future Land Use Element sets the categories, densities, and intensities on the future land use map.
Does zoning have to match the future land use map in Orlando?
Yes. Florida law requires zoning and development approvals to be consistent with the comprehensive plan. If a requested zoning district does not fit the parcel's future land use category, the owner needs a Growth Management Plan amendment as well.
How do I change the future land use of a property in Orlando?
Start with a pre-application meeting with the City Planning Division. The amendment goes to the Municipal Planning Board and then City Council, which adopts it by ordinance. Large-scale amendments add a second Council hearing and state review.
Is the Orlando future land use map the same as Orange County's?
No. The city and unincorporated Orange County each adopt their own comprehensive plan and future land use map. Check the Orlando Information Locator first to see whether a parcel is in the city.
Sources
The plans, maps, and agency documents cited on this page were checked on November 15, 2026. Plans and city policies change often, so confirm the current version before relying on any detail. This page is general information, not legal advice.
- City of Orlando: Growth Management Plan. The plan name, chapters, consistency rule, small-scale and large-scale thresholds, pre-application, and contacts.
- Growth Management Plan, Chapter 1 (February 2026). Adoption, refresh, and last amendment dates, and the 2050 vision.
- Growth Management Plan, Chapter 2 (February 2026). Figure LU-1 category standards, the Southeast Orlando Sector Plan standards (Goal LU.4), subarea policies, and the list of map series figures.
- City of Orlando: 2024 to 2050 Growth Projections Report. The 2050 horizon.
- City of Orlando: Map Library and citywide future land use map. The PDF sheets, their dates, and the annexation note.
- City of Orlando: Future land use GIS layer. Category codes on the map and the nightly refresh.
- City of Orlando: Orlando Information Locator. The interactive parcel lookup.
- City of Orlando: Municipal Planning Board Anticipated Cases. GMP2026-10008 and upcoming hearing dates.
- Florida Public Notices: Ordinance 2026-16 and Ordinance 2026-20 (published June 30, 2026). The July 13, 2026 City Council hearings.
- Central Florida Public Media: Vision 2050 to return with an opt-out for developers (September 29, 2026). Orange County's December 21, 2026 effective date.
- Florida Statutes 163.3194. The consistency requirement.
Related reading
- Orlando Zoning Map: How to Look Up Zoning in Orlando, Florida
Where the City of Orlando's official zoning map and Land Development Code live, what the R-1, R-3, O, MU, AC, I-G, PD, and overlay labels like /T and /SP mean, how city zoning differs from unincorporated Orange County, and how the city applies the Live Local Act.
- Future Land Use vs. Zoning: What's the Difference?
How a future land use designation differs from a zoning district, how the two fit together, what happens when they conflict, and when a project needs a plan amendment as well as a rezoning, with examples from Florida, Arizona, Texas, and Michigan.
- What Is a Future Land Use Map? FLUM Designations Explained
What a future land use map is, what a future land use designation controls, how the map differs from the zoning map, and how Tampa, Orange County, Pinellas County, Phoenix, and Austin publish theirs.
- What Is a Comprehensive Plan? General Plans and Master Plans Explained
What a comprehensive plan is, what goes in one, how the comprehensive plan map controls zoning, why it is also called a general plan or master plan, and how Tampa, Orange County, Phoenix, Austin, and Pinellas County handle theirs.
- Florida Comprehensive Plan Amendments: Small-Scale vs. Large-Scale, Process, and Timelines
How Florida's consistency rule makes a rezoning above the future land use category wait for a plan amendment, how small-scale and large-scale amendments work under sections 163.3187 and 163.3184, how long each takes, and how SB 180 and the Live Local Act change the picture.
- Orange County Future Land Use Map and Comprehensive Plan (Destination 2030 and Vision 2050)
Where unincorporated Orange County's future land use map, Destination 2030 comprehensive plan, and Vision 2050 map live, what the categories and place types allow, how they limit rezoning, and how the switch to Vision 2050 on December 21, 2026 works.