Future land use
Orange County Future Land Use Map and Comprehensive Plan (Destination 2030 and Vision 2050)
Where unincorporated Orange County's future land use map, Destination 2030 comprehensive plan, and Vision 2050 map live, what the categories and place types allow, how they limit rezoning, and how the switch to Vision 2050 on December 21, 2026 works.
The Orange County comprehensive plan for unincorporated land is in transition. Destination 2030, the county's 2010-2030 Comprehensive Plan, is the operative plan today, and its Orange County future land use map sets what each parcel can become. Vision 2050, the replacement plan, was readopted by the Board of County Commissioners on September 29, 2026, by a 5-2 vote. It is set to take effect December 21, 2026, with state approval, and developers can opt out of it until October 1, 2027. Its companion zoning code, Orange Code, replaces Chapter 38. For current zoning districts, see the Orange County zoning map guide.
Where the Orange County future land use map and comprehensive plan live
- InfoMap: the county's interactive map. It has layers for the current future land use map and for the Vision 2050 map (place types, planning sectors, and transects).
- Find My Parcel: county-linked maps hosted by Gridics. One shows the current future land use; a second shows Vision 2050 and Orange Code.
- Destination 2030 plan document: one large PDF, updated through Ordinance 2025-14. The Future Land Use Element (updated May 20, 2025) holds the category tables, and the Future Land Use Map Series is bound into the same book. No separate current map PDF was found.
- Future land use GIS layer: the county's open data layer for the current map, with each parcel's designation, amendment number, and effective date.
- Vision 2050 and Orange Code: the county's Engage Orange page has the adopted documents and the hearing history. The older ocfl.net Vision 2050 page still describes the plan as invalidated, so use Engage Orange.
- Questions: the Planning Division, 201 S. Rosalind Ave., 2nd Floor, Orlando, (407) 836-5321 or planning@ocfl.net.
Destination 2030 and Vision 2050 at a glance
- Destination 2030: the 2010-2030 Comprehensive Plan, renamed through Ordinance 2009-15 (May 19, 2009). Horizon 2030. It stays the operative plan until Vision 2050 takes effect.
- Vision 2050: the replacement plan, paired with Orange Code as the new zoning code. Horizon 2050. The county expects about 500,000 more residents by then.
- June 3, 2025: the Board adopted Vision 2050 and Orange Code.
- July 28, 2025: the Florida Department of Commerce found Vision 2050 "null and void" under SB 180 (Chapter 2025-190, Section 28, Laws of Florida), which bars counties hit by 2024 hurricanes from adopting more restrictive or burdensome plan changes. The state cited a green building requirement and Shingle Creek Basin protections.
- August 20, 2026: the Planning and Zoning Commission, acting as the Local Planning Agency, held its hearing on the readoption ordinance.
- September 29, 2026: the Board approved the ordinance 5-2. It sets a temporary, voluntary review process: privately initiated applications can opt out of Vision 2050 and be reviewed under Destination 2030. The ordinance does not change Vision 2050's goals, policies, or maps, or Orange Code.
- December 21, 2026: the date Vision 2050 is set to take effect, with state approval. No state decision had been reported as of November 15, 2026.
- October 1, 2027: the opt-out ends, the same date SB 180's restrictions end.
Once Vision 2050 takes effect, the county says any request to change a property's future land use designation must be processed as an amendment to Vision 2050.
Future land use categories
Destination 2030 categories (in effect now)
These come from Tables 1.1.2.A and 1.1.4A to 1.1.4H of the Future Land Use Element and the correlation table in Policy FLU8.1.1. Density is capped by the future land use designation regardless of zoning.
| Category | Code | Max density | Max intensity | What it is for |
|---|---|---|---|---|
| Low Density Residential | LDR | 0 to 4 du/ac | Not stated | Suburban single-family in the Urban Service Area. |
| Low-Medium Density Residential | LMDR | 0 to 10 du/ac, plus workforce housing bonus | Not stated | Single-family and multifamily. |
| Medium Density Residential | MDR | 0 to 20 du/ac, plus workforce housing bonus | Not stated | Urban-style multifamily. |
| Medium-High Density Residential | MHDR | 0 to 35 du/ac, plus workforce housing bonus | Not stated | Transition from urban areas, supporting transit. |
| High Density Residential | HDR | 0 to 50 du/ac, plus workforce housing bonus | Not stated | High-intensity urban residential. |
| Office | O | Not stated | 1.25 FAR (0.15 in Rural Settlements) | Professional offices and office parks. |
| Commercial | C | Not stated | 1.50 FAR (0.15 in Rural Settlements) | Neighborhood and community commercial. |
| Industrial | I | Not stated | 0.75 FAR | Light assembly to chemical processing. |
| Institutional | IN | Not stated | 2.0 FAR | Utilities and public or quasi-public facilities. |
| Educational | E | Not stated | 2.0 FAR | Public schools. |
| Planned Development | PD | Set by text amendment | Set by text amendment | Single or mixed use. The program is fixed when the land use is amended (FLU8.1.4). |
| Traditional Neighborhood Development | TND | Not stated | Office 1.7, commercial 1.0, industrial 0.5 FAR | Walkable mixed-use towns and villages. P-D zoning required. |
| Mixed Use Corridor | MUC | Up to 20 du/ac (correlation table: 11 to 20) | Minimum 0.3 to 1.0 FAR (correlation table: 3.0 FAR) | Staff-initiated corridor redevelopment and transit-oriented development. |
| Neighborhood Center | NC | Up to 40 du/ac | Up to 2.0 FAR non-residential | Holden Heights only. Neighborhood-serving mixed use. |
| Neighborhood Activity Corridor | NAC | Up to 25 du/ac | Up to 1.0 FAR non-residential | Holden Heights only. Mixed use along main roads. |
| Neighborhood Residential | NR | Up to 20 du/ac | Up to 0.40 FAR non-residential | Holden Heights only. Steps down from NAC. |
| Activity Center Mixed Use | ACMU | 12 to 30 du/ac on no more than 30 percent of the site | 3.0 FAR non-residential, 60 hotel rooms per acre | International Drive tourist and mixed use. PD required. |
| Activity Center Residential | ACR | 12 to 30 du/ac | 10,000 sq ft non-residential per 125 units, 50,000 sq ft cap | International Drive workforce housing. PD required. |
| Village (Horizon West) | V | 1 du/10 ac unless approved as a Special Planning Area | Set through the Special Planning Area | Horizon West villages, minimum 5 du/ac. PD required. |
| Community Village Center | CVC | Not stated | Not stated | Village centers, such as Four Corners. |
| Growth Center | GC | Set by PD | Set by PD | Northwest, Growth Center/Resort PD, and Aviation Growth Centers, set by joint planning agreements. |
| Innovation Way | IW | Set by PD | Set by PD | Innovation Way planning area, processed as planned developments. |
| Lake Pickett | LP | Transect-based, set on a Conceptual Regulating Plan | Transect-based | Transition from rural to denser development in the Lake Pickett Study Area. |
| Rural Settlement Low Density | RSLD 2/1 | 2 du/ac | Not stated | Existing rural and suburban lots. |
| Rural Settlement 1/1 | RS 1/1 | 1 du/ac | Not stated | Rural residential. |
| Rural Settlement 1/2 | RS 1/2 | 1 du/2 ac | Not stated | Rural residential. |
| Rural Settlement 1/5 | RS 1/5 | 1 du/5 ac | Not stated | Rural residential near the Urban Service Area. |
| Rural/Agricultural | R | 1 du/10 ac | Not stated | Agriculture and large-lot homes in the Rural Service Area. |
| Parks/Recreation | P/R | N/A | 0.8 ISAR | Active and passive parks. |
| Preservation | PRES | N/A | 0.10 FAR | Environmental lands and mitigation banks. |
| Conservation (overlay) | Not stated | N/A | 0.01 to 1.0 ISAR by class | Wetlands, set by a Conservation Area Determination. |
The categories investors and developers watch most are HDR (50 du/ac), MHDR (35 du/ac), ACMU on International Drive (3.0 FAR), MUC, NC (40 du/ac and 2.0 FAR), Commercial (1.50 FAR), and Industrial (0.75 FAR). Every PD, Growth Center, and Innovation Way project carries its own program, so read the adopting ordinance.
Orange County Vision 2050 map: place types (adopted, not yet in effect)
The Orange County Vision 2050 map replaces categories with about 37 place types grouped into six sectors: Established, Intended, Preserved, Rural, Special, and Targeted. Each place type ties to Orange Code transect zones. The figures below come from the county's Vision 2050 correlation table, dated 2023. Confirm them against the adopted plan.
| Place type | Base density | FAR | Flexible density with certified affordable or attainable housing |
|---|---|---|---|
| I-Drive District Regional Center | 35 to 70 du/ac | 4.0 | Max. 150 du/ac, with conditions |
| UCF Regional Center | 20 to 50 du/ac | 3.0 | Max. 100 du/ac |
| Tourist Activity Center | 12 to 50 du/ac | 3.0 | Max. 70 du/ac (30 du/ac cap in the Shingle Creek Protection Area) |
| Urban Core | 35 to 70 du/ac | 3.0 | Max. 120 du/ac |
| Urban Center | 20 to 50 du/ac | 3.0 | Max. 75 du/ac |
| Urban Corridor | 10 to 50 du/ac | 3.0 | Max. 75 du/ac |
| Neighborhood Center (High) | 10 to 40 du/ac | 3.0 | Max. 60 du/ac |
| Main Street Corridor | 10 to 40 du/ac | 3.0 | Max. 60 du/ac |
| Traditional Neighborhood | 10 to 30 du/ac | 1.5 | Max. 50 du/ac |
| Suburban Corridor | 10 to 20 du/ac | 1.5 | Max. 40 du/ac |
| Suburban Mixed Neighborhood | 6 to 12 du/ac | Not stated | Max. 20 du/ac |
| Suburban Neighborhood | Max. 6 du/ac | Not stated | Max. 8 du/ac for missing middle housing in one transect |
| Industrial | N/A | 0.75 | N/A |
Urban Core is generally limited to within a quarter mile of a premium transit station, and Urban Center to a quarter to a half mile. Other place types include Neighborhood Center (Low), Rural Center, Rural Settlement 1/1, 1/2, and 1/5, Horizon West, Innovation Way, Avalon Park, and Lake Pickett.
What it can be used for today
Check a parcel's current zoning
The future land use map shows where a city is headed. Zoning decides what you can build now. Zoning AI reads the ordinance for a specific parcel and answers questions about permitted uses, setbacks, FAR, height, or parking, with the section it came from.
- Plain-English answers with section-level citations
- Filter parcels by zoning before you spend a day on due diligence
- Owner, lot size, and last sale next to the zone
Free trial
How the future land use map limits zoning
Florida law requires land development regulations and development orders to be consistent with the adopted comprehensive plan (Fla. Stat. 163.3194). In Orange County, the correlation table in Policy FLU8.1.1 lists the zoning districts consistent with each designation. LDR, for example, allows R-1, R-1A, R-1AA, R-2, and PD, among others, while HDR allows R-2, R-3, UR-3, and PD.
The county says a proposal that is not consistent with the future land use map may need an amendment even if it fits the property's zoning. Most Chapter 38 districts leave density and floor area to the future land use designation, so the designation is the real ceiling. A rezoning to a district the designation does not allow needs a future land use amendment first, or with it. After December 21, 2026, that amendment is to Vision 2050, and Orange Code transects replace Chapter 38 districts, unless the applicant opts out before October 1, 2027. For districts and rezoning steps, see the Orange County zoning map guide.
How to change a parcel's future land use
Orange County splits future land use map amendments by size. See the guide to Florida comprehensive plan amendments for the state rules.
- Small-scale (under 10 acres): a required pre-application meeting, an application, community meetings, a Local Planning Agency hearing, and a Board hearing. Applications are taken monthly. The 2026 schedule runs about four months from application deadline to Board hearing. The fee is $3,529.
- Large-scale, or regular cycle (10 acres or more): two cycles a year with four hearings, two to transmit to the state and two to adopt, plus state review. The fee is $6,228. The 2026 first cycle took applications by March 13, 2026, with an effective date of January 2027. The second cycle took applications by September 18, 2026, with an effective date of July 2027.
- Effective date: if approved and not challenged, 31 days after the Florida Department of Commerce tells the county the package is complete.
- PD rezonings: when an amendment runs with a PD rezoning, timing follows the Development Review Committee, which typically takes 4 to 5 months to reach.
The county's schedules warn that applications still in process when Vision 2050 takes effect will be withdrawn, or staff will work with applicants to adjust them to Vision 2050 designations.
What is changing in Orange County
As of November 15, 2026:
- Vision 2050 and Orange Code take effect December 21, 2026, with state approval: the Orange County Vision 2050 map and Orange Code would replace Destination 2030 and Chapter 38 across unincorporated Orange County. The Board readopted it 5-2 on September 29, 2026. Report.
- Developer opt-out to October 1, 2027: privately initiated applications can choose review under Destination 2030 until the opt-out sunsets. County agenda preview.
- Pending amendments in the switch: 2026 first-cycle amendments had Board adoption hearings set for about November 2026. Applications still pending on December 21, 2026 will be withdrawn or adjusted to Vision 2050. Schedule.
- Targeted growth areas from December 21, 2026: the Vision 2050 map puts the highest place types (Regional Centers, Urban Core, Urban Center) around International Drive, UCF, and premium transit stations. Vision 2050 GIS layer.
The Board's long-range agenda lists upcoming future land use hearings, and the Engage Orange planning hub posts community meetings for pending amendments.
Other plans that apply
- International Drive Activity Center Element: an optional element with the ACMU and ACR rules and a conceptual regulating plan (Map 23 of the Future Land Use Map Series).
- Horizon West: six adopted Special Planning Areas (Lakeside, Bridgewater, Town Center, Village F, Village H, and Village I).
- Innovation Way, Growth Centers, and Lake Pickett: each has its own goals and regulating plans in the Future Land Use Element.
- Cities: Orlando and the other 12 cities adopt their own plans. Land annexed into a city keeps the county designation until the city amends its plan. See the Orlando future land use guide.
How to check a parcel's future land use
- Find the parcel in InfoMap or the Property Appraiser map, and confirm it is not inside a city.
- Turn on the future land use layer in InfoMap, or open Find My Parcel, to see the current Destination 2030 designation.
- Turn on the Vision 2050 place type layer, or open the Vision 2050 Find My Parcel map, to see the designation planned for December 21, 2026.
- Look up both in the Future Land Use Element tables and the FLU8.1.1 correlation table to see which zoning districts fit.
- Check the Engage Orange planning hub and the Board's long-range agenda for pending amendments nearby.
- Confirm the designation, and whether the opt-out suits your application, with the Planning Division before you rely on it.
Frequently asked questions
Where is the Orange County future land use map?
InfoMap and the county's Find My Parcel maps show it parcel by parcel. The official map series is bound into the Destination 2030 plan PDF, and the county also publishes it as an open GIS layer. This is Orange County, Florida; Orange County, North Carolina and California have separate maps.
What is Orange County Vision 2050?
Vision 2050 is the county's new comprehensive plan, with Orange Code as its zoning code. It replaces future land use categories with place types in six sectors. The Board readopted it on September 29, 2026, and it is set to take effect December 21, 2026, with state approval.
What is Destination 2030?
Destination 2030 is the 2010-2030 Orange County comprehensive plan. It is the operative plan until Vision 2050 takes effect. Developers can still choose review under it until October 1, 2027.
Does zoning have to match the future land use map in Orange County?
Yes. Florida law requires zoning to be consistent with the comprehensive plan, and the county's correlation table lists which districts fit each designation. If they do not match, a future land use amendment is needed.
How do I change the future land use of a property in Orange County?
Book a pre-application meeting with the Planning Division, then apply as a small-scale amendment (under 10 acres) or in a regular cycle (10 acres or more). The Local Planning Agency and the Board hold hearings, and large-scale amendments also go through state review. After Vision 2050 takes effect, the request is an amendment to Vision 2050.
Sources
The plans, maps, and agency documents cited on this page were checked on November 15, 2026. Plans and county policies change often, so confirm the current version before relying on any detail. This page is general information, not legal advice.
- Orange County Comprehensive Plan, updated through Ordinance 2025-14. Destination 2030 category tables, the FLU8.1.1 correlation table, and the Future Land Use Map Series.
- Orange County: Future Land Use Amendment. Small-scale and large-scale hearings, the 10-acre threshold, fees, steps, effective date, Find My Parcel, and contacts.
- Orange County: 2026 Future Land Use Map Amendment Schedules (updated July 31, 2026). Small-scale and regular cycle dates, PD timing, and the Vision 2050 note.
- Orange County: Vision 2050 and Orange Code (updated September 21, 2026). Adoption, the state's finding, and the readoption hearings.
- Central Florida Public Media: Vision 2050 to return with an opt-out for developers (September 29, 2026). The 5-2 vote, the December 21, 2026 date, state approval, and the October 1, 2027 opt-out end.
- Orange County: Board meeting preview, September 29, 2026. Destination 2030's status, the voluntary review process, and future land use changes after Vision 2050.
- Central Florida Public Media: State says Vision 2050 is null and void (July 30, 2025). The state's finding and its reasons.
- Orange County: Vision 2050 correlation table (2023). Place type densities, FAR, and flexible density.
- Orange County: Future land use GIS layer and InfoMap layers. Current designations, Vision 2050 place types and sectors, and coverage of annexed land.
- Florida Statutes 163.3194. The consistency requirement.
Related reading
- Orange County Zoning Map: How to Look Up Zoning in Unincorporated Orange County, Florida
Where unincorporated Orange County's zoning map and Chapter 38 zoning code live, what the A-1, R-1, R-CE, P-O, C-1 to C-3, I-1A to I-4, NC, NAC, and P-D districts mean, how to tell county zoning from Orlando and the other 12 cities, and how the county applies the Live Local Act.
- Future Land Use vs. Zoning: What's the Difference?
How a future land use designation differs from a zoning district, how the two fit together, what happens when they conflict, and when a project needs a plan amendment as well as a rezoning, with examples from Florida, Arizona, Texas, and Michigan.
- What Is a Future Land Use Map? FLUM Designations Explained
What a future land use map is, what a future land use designation controls, how the map differs from the zoning map, and how Tampa, Orange County, Pinellas County, Phoenix, and Austin publish theirs.
- What Is a Comprehensive Plan? General Plans and Master Plans Explained
What a comprehensive plan is, what goes in one, how the comprehensive plan map controls zoning, why it is also called a general plan or master plan, and how Tampa, Orange County, Phoenix, Austin, and Pinellas County handle theirs.
- Florida Comprehensive Plan Amendments: Small-Scale vs. Large-Scale, Process, and Timelines
How Florida's consistency rule makes a rezoning above the future land use category wait for a plan amendment, how small-scale and large-scale amendments work under sections 163.3187 and 163.3184, how long each takes, and how SB 180 and the Live Local Act change the picture.
- Orlando Future Land Use Map and Comprehensive Plan (Growth Management Plan)
Where the City of Orlando's future land use map and Growth Management Plan live, what the activity center, mixed use corridor, residential, office, and industrial categories allow, how they limit rezoning, and which plan amendments are moving in 2026.