Data Center Site Selection: Power, Zoning, Land and Flood Criteria
The land-side view of data center site selection as of November 2026, from large-load tariffs and substation data to zoning districts, acreage, water, flood, tax statutes and the moratoria now spreading across Florida, with a checklist and a regional screening workflow.
Data center site selection is the work of finding land that can get power, zoning approval, water and fiber on a schedule a tenant will sign. For a land developer, the order of questions matters. Power comes first: whether the utility can deliver the megawatts, and on what contract terms. Zoning comes next, then whether the parcel is big enough, outside the floodplain and politically viable. A site that fails the power test is not a data center site, however good the dirt.
This page covers the developer's side, not choosing a colocation provider. Laws, tariffs and local rules were checked on November 19, 2026 and are changing month to month.
What are the data center site selection criteria?
The criteria are power, zoning, land size and shape, water, fiber, flood, tax incentives, noise and setbacks, and community acceptance. Use this checklist for each candidate parcel.
| Criterion | What to check | Public source | Red flag |
|---|---|---|---|
| Power | Utility, capacity, large-load tariff, study fee, contract term | Tariffs, state commission orders, utility load study | Utility needs site control you do not have |
| Transmission | Distance to lines above 69 kV and to substations | Archived HIFLD lines, EIA-860, utility maps | Nearest line is low voltage |
| Zoning | Data center listed by right, conditional, or absent | Zoning code use table | Use not listed, or a pending amendment |
| Future land use | Industrial or employment category | Comprehensive plan map | Rural category needing a plan amendment |
| Size and shape | Net acres after setbacks, buffers, substation, stormwater | Parcel records, survey | Narrow parcel next to homes |
| Water | Supply, reclaimed water, permit path | Water utility, water management district | No reclaimed line at the boundary |
| Fiber | Carriers and route diversity | Carriers directly | Single carrier, single path |
| Flood | Flood zone and effective map date | FEMA National Flood Hazard Layer | Pad or substation in the 1 percent annual chance floodplain |
| Tax | Exemption thresholds and sunset | State statute | Project below the threshold |
| Noise and setbacks | Use-specific standards, noise studies | Zoning code, noise ordinance | Residential lots on two sides |
| Community | Moratoria, lawsuits, pending ordinances | Agendas, court dockets, local news | Neighbors adopting moratoria |
How much power does a data center need, and how close to a substation?
Large data centers draw tens to hundreds of megawatts, and the utility sets the timeline. A Lawrence Berkeley National Laboratory report for the Department of Energy found data centers used about 4.4 percent of US electricity in 2023 (176 TWh) and projected 6.7 to 12 percent by 2028.
Regulators now define a "large load" by size, and the definitions differ:
- FERC: an order issued June 18, 2026 opened a proceeding on PJM's tariff. It said it appeared reasonable to define a large load as a new commercial or industrial customer at one site with a peak of 50 MW or more, connected above 69 kV. The rulemaking (Docket RM26-4) began with a Department of Energy request on October 23, 2025.
- Florida: SB 484 (2026) sets the line at an anticipated monthly peak of 50 MW at one location, and bars splitting a load into smaller connections to avoid it.
- Texas (ERCOT): SB 6 (2025) sets a 75 MW threshold, a study fee of at least $100,000, and proof of site control through ownership, a lease or another legal interest.
- Virginia (Dominion): the State Corporation Commission's November 25, 2025 order created Rate Schedule GS-5, effective January 1, 2027, for customers of 25 MW or more with a load factor of at least 75 percent. It sets 14-year contracts and minimum charges of 85 percent of contracted demand for distribution and transmission, and 60 percent for generation.
These terms change land deals: the developer needs an option or contract on the land before the utility will study it. Florida's SB 484 also makes each large load customer bear its full cost of service, with compliant tariffs due by October 1, 2026. FPL told regulators its tariffs from the November 2025 rate settlement already comply; as reported, they require a 20-year minimum contract, the customer's own substation and upfront payment for new facilities.
Distance to a substation is a screening proxy, not an answer. A nearby substation may have no spare capacity. Only the utility's load study answers the capacity question.
One Florida detail matters for land: s. 163.3208 makes electric substations a permitted use in almost every land use category, but SB 484 says a large load customer may not be treated as a substation for that purpose.
How much land does a data center need?
It ranges from a few acres for a small or edge facility to well over a thousand acres for a hyperscale campus, depending on megawatts, height, setbacks, the substation pad, stormwater and buffers.
- Hyperscale campus: the Prince William Digital Gateway rezonings in Virginia covered 1,760 acres (884, 534 and 342 acres) for 22.2 million square feet and as many as 37 data centers. Height caps were 60 to 85 feet in most areas. That is roughly 12,600 square feet per acre, a floor area ratio near 0.29.
- Single large building: Texas sets its basic exemption at 100,000 square feet in one building, and its large project exemption at 250,000 square feet on one parcel or contiguous parcels.
- Small and edge facilities: Fairfax County, Virginia, caps a data center building at 40,000 square feet in its C-3 and C-4 districts and 80,000 square feet in I-2 to I-4, unless a special exception allows more. Buildings that size fit infill industrial lots.
Shape matters as much as area. Fairfax requires data center buildings to sit at least 200 feet from residential property, and ground equipment 300 feet unless the building screens it. On a square 10-acre parcel, about 660 feet on a side, a 200-foot setback along one edge removes about 30 percent of the depth. Our guides to industrial zoning types and land assemblage cover district standards and combining parcels.
Which zoning districts allow data centers?
Where codes name the use, data centers are usually permitted in industrial districts, conditional in some commercial or planned districts, and not allowed in residential districts. Northern Virginia shows the direction. Fairfax County's September 2024 amendment made data centers a special exception in its PDC and PTC planned districts and requires one above set building sizes, and Loudoun County moved them from by right to conditional use or special exception approval in 2025.
- Loudoun County, Virginia: on March 18, 2025, data centers became a conditional or special exception use where they had been allowed by right, with grandfathering for some applications accepted before February 12, 2025. Phase 2 is reviewing standards for noise, height, onsite generation and substations, with a Board hearing planned for July 2027.
- Fairfax County, Virginia: 2024 amendments added the setbacks above, a one-mile distance from Metro station entrances, enclosed or screened equipment, and noise studies before site plan approval and after construction.
- Texas counties: counties have no general zoning power. Local Government Code Chapter 231 grants it only in listed areas, such as Padre Island and around certain lakes, so in unincorporated Texas the controls that bite are utility, water and state permits.
- Pinellas County, Florida: in August 2026 the county attorney said the development code "does not allow standalone data centers as a primary use," and commissioners asked staff to draft a resolution saying so.
Many older codes do not list data centers at all, so the zoning official decides which listed use it most resembles, or finds it not permitted. Get that interpretation in writing, ideally in a zoning verification letter. If a rezoning is needed, plan for the timeline and a crowded hearing.
Florida adds two wrinkles. SB 484 confirms that local governments keep their zoning power over large load customers. But s. 252.422 bars a county or city in a federal hurricane disaster declaration area from adopting a moratorium or more restrictive land rules for one year after landfall. Pinellas County's attorney called moving ahead anyway a risk, and pointed to Hillsborough County deferring action for that reason.
How much water does a data center use?
It depends on the cooling design. The LBNL report estimated direct water use by US data centers at 66 billion liters (about 17 billion gallons) in 2023.
Florida's SB 484 created a separate water permit path for a large-scale data center (50 MW or more):
- No permit if local zoning and the comprehensive plan prohibit the use.
- Reclaimed water is required where a supply is available, lines reach the property boundary with enough capacity, and its use is feasible.
- Requests of 100,000 gallons a day or more must itemize cooling use and include a conservation plan.
- No approval without a hearing.
Built for your team
Have Plotzy build this workflow on your criteria
Plotzy builds AI workflows that run on parcel, zoning and owner data: your buy box, your markets, your review steps, with every answer traced to its source. Start with a 30-minute call about the workflow you want automated.
- Working prototype in the first 2 weeks
- Answers cite the code section, record or dataset they came from
- Outputs land in your CRM, spreadsheet or deal pipeline
30 minutes, no pitch deck
What about fiber?
Fiber is usually solvable but rarely visible in public data. There is no complete public map of long-haul and metro fiber routes, so a screen flags candidate parcels and the developer confirms carriers, route diversity and build cost with providers.
How do you check flood risk for a data center site?
Use FEMA's National Flood Hazard Layer, then confirm against the effective flood map. FEMA describes the NFHL as current effective flood hazard data, updated continuously from new maps and Letters of Map Change, covering more than 90 percent of the US population.
Record each panel's effective date, because map dates vary. The NFHL shows regulatory flood zones, not every hazard; in Florida, also check storm surge and the local coastal high hazard area.
Which states offer data center tax incentives?
Many states exempt data center equipment from sales tax once a project meets investment and size thresholds. As written in each statute in November 2026:
| State | Statute | Main thresholds | Ends |
|---|---|---|---|
| Florida | s. 212.08(5)(r), F.S. | 100 MW critical IT load, $150 million investment, 1 MW per tenant, within 5 years of construction start | No new temporary certificates after June 30, 2037 |
| Virginia | Va. Code s. 58.1-609.3(18) | $150 million and 50 new jobs at 1.5 times the local average wage ($70 million and 10 jobs in a distressed locality) | June 30, 2035, with extensions under subdivision 19 |
| Texas | Tax Code s. 151.359 | 100,000 square feet, 20 qualifying jobs, $200 million over 5 years | 10 years, or 15 years at $250 million or more |
| Texas | Tax Code s. 151.3595 | 250,000 square feet, 40 qualifying jobs, $500 million | 20 years |
Florida's 100 MW floor leaves smaller projects without the state exemption. SB 484 also removed the optional 12-month extension of confidentiality for a company's plans to locate a data center, so a Florida site search has less time out of the public record.
What noise, setback and community signals should a developer watch?
Noise limits and residential setbacks decide whether a parcel next to homes works at all, and opposition now decides many approvals. The Digital Gateway rezonings capped noise at 60 decibels by day and 55 at night at the edge of residential land, excluding construction and emergency generators.
The project also shows how opposition plays out. A circuit court voided the three rezonings in 2025 over defective newspaper notice for the December 2023 hearing. The Court of Appeals of Virginia affirmed on March 31, 2026, and after the county and Compass Datacenters dropped their appeals, QTS withdrew its Virginia Supreme Court petition on July 2, 2026, ending the project.
Signals to track in any target market:
- Moratoria in the county or its neighbors.
- Pending amendments that move the use to special exception.
- Lawsuits over prior approvals, including procedural ones such as notice.
- Large turnouts at hearings on nearby projects.
How does a regional data center screening workflow work?
A screening workflow joins parcels, zoning, power infrastructure, flood and local politics so a team reviews a short list instead of a county:
- Set the buy box. Megawatts, minimum net acres, maximum distance to transmission, excluded flood zones, jurisdictions in or out.
- Pull parcels. Every parcel above the acreage floor, with owner, land use and assessed value.
- Attach zoning and future land use. Tag each parcel with its district and whether the code lists data centers by right, conditional or not at all, with the section.
- Add power proxies. Measure distance to transmission lines and known substations. Public data is thin: public access to HIFLD Open ended in August 2025, and DHS now limits HIFLD Secure to homeland security mission partners with an approved data use agreement. An archived copy of the open data has transmission lines (69 to 765 kV) and power plants but no substations layer. EIA-860 adds plant data (final 2025 data released September 10, 2026). Utility maps, commission filings and licensed datasets fill the gaps.
- Overlay flood. Intersect each parcel with the NFHL and record the share in the flood zone and the panel date.
- Check local rules. Moratoria, pending ordinances and litigation by jurisdiction, with dates.
- Rank and review. A person reviews the top parcels, then the team asks the utility for load studies on the best few.
The output is a ranked list with the reason each parcel passed or failed and a source for every fact.
Worked example: Tampa Bay, Florida, November 2026
Suppose a developer wants 100 MW of critical IT load, the size at which Florida's sales tax exemption starts, in the Tampa Bay region. Step 6 changes the map before any parcel is scored:
| Jurisdiction | Status found | Screen result |
|---|---|---|
| Unincorporated Pinellas County | Code does not allow standalone data centers as a primary use, per the county attorney; resolution in preparation (August 2026) | Excluded |
| Unincorporated Manatee County | 12-month moratorium on data centers and other high-electricity facilities, approved October 8, 2026 | Excluded until about October 2027 |
| Pasco and Hernando counties | Moratoria reported in 2026 | Excluded pending ordinance review |
| Pinellas Park and Lakeland | City moratoria reported in 2026 | Excluded |
| Unincorporated Hillsborough County | Moratorium action deferred over the 2025 post-hurricane limits | Kept, flagged for political risk |
| Every surviving parcel | SB 484 water permit hearing, 50 MW large-load tariff, utility load study | Applied to all |
Surviving parcels then go through steps 2 to 5: industrial or employment future land use, net acreage, distance to transmission and flood share. In Florida in late 2026, the jurisdiction filter removes more land than the acreage filter does.
Doing it by hand versus automated
By hand, an analyst checks the parcel viewer, zoning code, future land use map, FEMA's viewer, a transmission map and commission agendas for each jurisdiction: hours per parcel and weeks per region. Errors creep in where sources disagree or lag: a zoning layer behind an amendment, a revised flood panel, a moratorium adopted after the screen ran, or a planned development whose site plan sets the rules.
An automated screen runs the same steps across every parcel and reruns when a source changes. It does not replace the utility study, the survey or a land use attorney.
How Plotzy builds this for your team
Plotzy builds production site selection systems that join parcel, zoning and owner data with the public and licensed sources a data center screen needs, and cite the source for every finding. Plotzy runs zoning Q&A agents, owner contact research and automated report generation in production today.
What a build includes:
- Your buy box written as rules: megawatts, acreage, flood tolerance, distance to transmission, jurisdictions in or out.
- Runs across your pipeline or a whole region, not one parcel at a time.
- Data pipelines that wire in FEMA flood zones, transmission lines, utility territories and moratorium tracking from public or licensed sources, alongside county assessor feeds and your internal systems.
- Outputs into your CRM or spreadsheet, with the reason each parcel passed or failed.
- Human review points for planned developments, split zoning, flood edge cases and anything a deal depends on.
- Citations back to the code section on every zoning answer.
How an engagement runs: a working prototype in the first 2 weeks, a proof of concept within 30 days, and production in 8 to 12 weeks, depending on complexity. See custom AI software.
What you can do today, self-serve: search 150M+ parcels across 3,200+ US counties in Site Selection. Filter by zoning, lot size, land use and geography (polygon, radius, ZIP or county), save candidates to folders with notes, and export to CSV. Every parcel carries a zoning category and designation. Zoning AI (Production plan and up) answers what the code allows on a parcel, with the section cited. It covers the Florida jurisdictions where Plotzy has loaded zoning parcel by parcel. Owner contact lookup draws on public sources such as Secretary of State filings when you are ready to approach a landowner.
If you want a data center land screen run across your target region, book a 30-minute call below.
Questions to ask before you build or buy
- Which power sources does it use, and does it say when it has no substation data?
- Does every zoning finding cite the code section and the date it was read?
- How does it handle uses the code does not name?
- Does it track moratoria and pending ordinances, with dates?
- Can a person review and override a result, and is that logged?
Frequently asked questions
How many acres does a data center need?
From a few acres for a small facility to over 1,000 acres for a hyperscale campus. The Prince William Digital Gateway rezonings covered 1,760 acres for 22.2 million square feet. Net buildable area matters more than gross acreage.
What zoning do data centers need?
Usually an industrial district, where some codes allow them by right. Loudoun County moved data centers to special exception in 2025. Where the code does not name the use, get a written interpretation.
How close to a substation should a data center be?
There is no fixed distance. Proximity is a screening proxy; available capacity at a specific substation or line is what matters, and only the utility's load study answers it.
Can Florida counties ban data centers?
SB 484 confirms local zoning power over large load customers, and several counties adopted moratoria in 2026. Section 252.422 limits new moratoria for a year after a hurricane landfall in declared areas, so check each county's status and legal exposure.
Sources
The statutes, orders, codes and agency documents cited on this page were checked on November 19, 2026. Laws, tariffs and local rules change often, so confirm the current text before relying on any detail. This page is general information, not legal or engineering advice.
- U.S. Department of Energy: DOE Releases New Report Evaluating Increase in Electricity Demand from Data Centers, accessed November 2026. The 4.4 percent, 176 TWh and 6.7 to 12 percent figures.
- Lawrence Berkeley National Laboratory: 2024 United States Data Center Energy Usage Report, accessed November 2026 through an archived copy dated May 23, 2025 (the live file returned 403). Direct water consumption figures.
- FERC: Interconnection of Large Loads to the Interstate Transmission System, Docket RM26-4-000, accessed November 2026 through an archived copy dated October 23, 2026 (the live page returned 403). The October 23, 2025 DOE directive and ANOPR.
- FERC: Order Instituting Proceeding, PJM Interconnection, Docket EL26-67-000 (June 18, 2026), accessed November 2026. The proposed 50 MW and 69 kV large load definition.
- Virginia State Corporation Commission: Final Order, Case PUR-2025-00058 (November 25, 2025), accessed November 2026, copy of the order hosted by NPR. Rate Schedule GS-5.
- Texas Legislature: SB 6, 89th Legislature, enrolled text, accessed November 2026. Utilities Code s. 37.0561, the 75 MW threshold, study fee and site control.
- Florida Senate: CS/CS/SB 484 (2026), Data Centers and enrolled text, accessed November 2026. Chapter 2026-65, ss. 163.326, 288.075, 366.043, 373.203, 373.262 and 373.239.
- Florida Statutes s. 163.3208, s. 212.08 and s. 252.422 (2026), accessed November 2026. Substation siting, the data center property exemption, and post-hurricane limits.
- Florida Public Service Commission: Order PSC-2026-0117-FOF-EI, Docket 20250011-EI (April 27, 2026), accessed November 2026 through an archived copy dated November 13, 2026 (the live site reset the connection). Approval of FPL's 2025 settlement on November 20, 2025.
- WUSF: FPL tells regulators rate structure complies with data center law (October 4, 2026), accessed November 2026 (secondary). FPL's compliance filing and large load terms.
- Loudoun County: Data Center Standards & Locations and Phase 2, accessed November 2026. Phase 1 adoption, grandfathering, and the Phase 2 scope and timeline.
- Fairfax County: Data Centers Zoning Ordinance Amendment and adopted text, ZO 112.1-2024-9, accessed November 2026. Section 4102.6.A standards.
- Court of Appeals of Virginia: Board of County Supervisors of Prince William County v. Oak Valley Homeowners Association, Record No. 1590-25-4 (March 31, 2026), accessed November 2026 through an archived copy dated May 9, 2026 (the live file returned 403). Acreage, floor area, heights, noise proffers and the holding.
- WTOP / InsideNoVa: Digital Gateway data center project dies after final developer withdraws appeal (July 2, 2026), accessed November 2026 (secondary). The end of the appeals.
- Texas Local Government Code, Chapter 231 and Tax Code, Chapter 151, accessed November 2026. County zoning areas and ss. 151.359 and 151.3595.
- Code of Virginia s. 58.1-609.3, accessed November 2026. Subdivisions 18 and 19.
- FEMA: National Flood Hazard Layer, accessed November 2026. What the NFHL is, coverage, updates and access.
- DHS: Homeland Infrastructure Foundation-Level Data (HIFLD), accessed November 2026. HIFLD Secure access requirements. And Source Cooperative: HIFLD Archive (secondary), the August 2025 removal of public access and the archived dataset inventory.
- EIA: Form EIA-860 detailed data, accessed November 2026. Release of final 2025 data.
- St Pete Catalyst: Pinellas moves to shut the door on large data centers (August 27, 2026), accessed November 2026 (secondary). The county attorney's statements and the Hillsborough reference.
- WUSF: Manatee County approves a 12-month moratorium on large-scale data centers (October 9, 2026), accessed November 2026 (secondary). The Manatee vote and the list of other Florida moratoria.
Related reading
- AI Site Selection for Commercial Real Estate: A Land-First Screening Workflow
How AI site selection screens parcels for a specific asset across one or many markets, which data layers it runs on, how scoring works, where retail trade-area tools fit, and a car wash screen in Hillsborough County, Florida.
- AI Zoning Analysis: Screen Every Parcel Against Your Buy Box, With the Code Section Cited
How AI zoning analysis reads the zoning code against a parcel layer, why that beats a district lookup table, where it still fails, and a worked screen of 618 industrial parcels in Hillsborough County, Florida.
- AI Real Estate Due Diligence: What to Automate and What to Verify
How AI handles land and pre-acquisition due diligence from public records, which checks still need a surveyor, title insurer, environmental professional or planner, and a cited summary for a real parcel in Hillsborough County, Florida.
- Types of Industrial Zoning: M-1, M-2, M-3, I-1, I-2, LI, HI and Business Parks Explained
How industrial zoning tiers work, what M-1, M-2, M-3, I-1, I-2, LI, HI, IP, and BP usually mean, what separates light from heavy industrial, how to tell which ladder a city uses, and how to check a parcel for warehouse, outdoor storage, flex, or self-storage.
- Land Due Diligence Checklist: What to Verify Before You Buy, Including Entitlements
A pre-acquisition land due diligence checklist with why each item matters, where to find it, who verifies it, and when to order it, plus what entitlement means, the usual entitlement steps, and how to manage entitlement risk, with Florida rules and a Cape Coral example.